Alignment Summary
overall_status: partially_aligned critical_issues: 0 high_issues: 2 medium_issues: 3 low_issues: 0
Alignment Findings
- [MEDIUM] 13 proposed items without progression.
- Recommendation:
- [HIGH] Decision Persistence Gap: Core Orchestration Pipeline is operational but remains in 'proposed' status without a finalized ADR.
- Recommendation: Promote aw-ideas-to-life-cas-2026-05-31-003 to 'accepted' status following architect review to stabilize the baseline.
- [MEDIUM] Lifecycle Inconsistency: AEM Evolution Map stages do not strictly align with Architecture Work decision states.
- Recommendation: Update AEM generation logic to ensure items only move to 'NEXT' or 'DONE' if their corresponding Architecture Work/ADR is 'accepted'.
- [HIGH] Single Source of Truth Violation: Inconsistencies between the Architecture Work Registry (authoritative) and AEM (derived summary).
- Recommendation: Re-synchronize AEM summary views to strictly reflect the state of the Architecture Work Registry.
- [MEDIUM] Proposal Saturation: High volume of proposed architecture work items relative to accepted decisions.
- Recommendation: Schedule a governance review session to process the backlog of 13 proposed items.
Architecture Work Derived
- [MEDIUM] Too many unprogressed proposals
- [HIGH] Finalize and accept ADR for the Core Orchestration Pipeline (aw-ideas-to-life-cas-2026-05-31-003).
- [MEDIUM] Align AEM Evolution Map stage derivation logic with rule-decision-status-drives-stage.
- [HIGH] Reconcile AEM summary views with the Architecture Work Registry to eliminate planning drift.