Architecture Intent
Strategic Vision
- What we are building: An Architecture Intelligence Platform that bridges the gap between high-level business intent and low-level code implementation through an automated reasoning loop.
- Why it exists: To solve the governance velocity bottleneck and ensure that architectural decisions are continuously validated against both code reality and business objectives.
Project Context
primary_context: ideas-to-life-cas aw_count: 30 alignment_findings: 3
Current State Alignment
The system is currently 'partially_aligned'. While the technical foundations (decoupled reasoning, knowledge abstractions) are implementation-complete, the governance layer is lagging with a 15:1 velocity bottleneck and a lack of formal business intent integration.
Focus Areas / Roadmap
- Phase 1: Institutionalize Architecture Work Registry as the single authoritative planning source.
- Phase 2: Operationalize the 'Detect-Analyse-Execute' automated reasoning loop to address the velocity bottleneck.
- Phase 3: Formalize and integrate the Business Intent Schema into the Alignment Engine.
- Phase 4: Deploy the Architecture Knowledge Graph for advanced impact analysis and lineage.
Gaps & Tensions (Risks)
- Governance Velocity Lag: Proposal generation exceeds review capacity (15:1 ratio).
- Persistence Drift: The Architecture Work Registry is not yet the authoritative source for all generation cycles.
- Semantic Gap: Absence of a formal schema to ingest and map business-level strategic intent.
- Traceability Drift: Visual diagrammatic representations are lagging behind accepted ADRs.
Principles
- {'name': 'Decentralized Governance Participation', 'statement': 'Governance must be embedded in operational execution, not centralized as a bottleneck.'}
- {'name': 'Traceability Over Abstraction', 'statement': 'Every architectural insight must be linked back to concrete implementation evidence or intent signals.'}
- {'name': 'Decision-Centricity', 'statement': "The Architecture Decision Record (ADR) remains the ultimate source of truth for the system's governed state."}
Emergent Heuristics
governance_velocity_limit: If the ratio of proposed to accepted items exceeds 10:1, automation of reasoning loops must be prioritized over new feature extraction. pattern_promotion_trigger: Done implementations remaining in PENDING for more than 14 days should trigger an automatic governance escalation.