Architecture Intent
Strategic Vision
- What we are building: An Architecture Intelligence Platform that connects Business Intent, Architecture, and Code via continuous reasoning loops.
- Why it exists: To eliminate the gap between strategic architectural intent and implementation reality, preventing structural erosion through embedded GovernanceOps.
Project Context
primary_context: ideas-to-life-cas aw_count: 30 alignment_findings: 1
Current State Alignment
Foundation is stable with a clear 'Single Source of Truth' in the Architecture Work Registry. Significant governance bottleneck exists with 22 pending proposals.
Focus Areas / Roadmap
- Immediate: Batch governance review to process the 22-item proposal backlog (Priority: High).
- Short-term: Formalize Business Intent Schema and VisionToIntent workflow (Priority: High).
- Short-term: Update AW metadata to resolve 'Single Source of Truth' violations (Priority: Medium).
- Medium-term: Develop Architecture Knowledge Graph for cross-project lineage analysis (Priority: Medium).
- Long-term: Implement Automated CI Validation for real-time skill and pattern enforcement (Priority: Medium).
Gaps & Tensions (Risks)
- Governance Bottleneck: High volume of proposed items (22) compared to completed items (7) creates strategic drag.
- Metadata Drift: Inconsistency between artifact lifecycle states and internal decision metadata.
- Traceability Gap: Low integration of formal business intent signals into the architectural graph.
- Pattern Decay: Presence of stale 2026-04 era implementation signals that lack reconciliation with current standards.
Principles
- Human governance remains authoritative; automation participates but does not decide.
- Prefer traceability over abstraction; every architectural insight must link to evidence.
- Decisions are central; all system capabilities must integrate with the ADR lifecycle.
- Forensic evidence beats manual documentation; trust the AST over the README.
Emergent Heuristics
Forensic_Priority: Prioritize diagnostic findings over manual status updates when determining system state. Backlog_Health_Ratio: Maintain a sustainable ratio of PROPOSED to DONE items to prevent information rot. Intent_Traceability_Requirement: No architectural pattern should exist without a direct link to an ADR or Business Intent signal.