Architecture Intent
Strategic Vision
- What we are building: A Continuous Architecture Intelligence Platform connecting business intent, architectural decisions, and operational code implementation into an automated reasoning feedback loop.
- Why it exists: To eliminate divergence between strategic drivers and real-world implementation, preventing structural erosion proactively while automating architectural alignment and governance.
Project Context
primary_context: ideas-to-life-cas aw_count: 30 alignment_findings: 4
Current State Alignment
The system currently exhibits critical alignment tensions: core orchestration execution operates ahead of ratified ADR governance, synthetic placeholder records contaminate the work registry, and roadmap items progress prematurely without accepted forum decisions.
Focus Areas / Roadmap
- Ratify foundational Core Orchestration Pipeline ADR through Architecture Forum
- Sanitize Architecture Work Registry and establish strict intake schema validation
- Enforce lifecycle gating requiring accepted ADR status before promotion to NEXT
- Formalize machine-readable Business Intent schema and integrate into Alignment Engine
- Deploy automated Detect-Analyse-Execute loops for continuous operational governance
Gaps & Tensions (Risks)
- Core orchestration pipeline executes without formal ADR baseline ratification (ALIGN-001)
- Authoritative work registry compromised by synthetic placeholder data (ALIGN-002)
- Lifecycle stage progression to NEXT precedes accepted architectural decisions (ALIGN-003)
- Business intent integration lacks a formal structured machine-readable contract (ALIGN-004)
- High volume of unprogressed proposals creating governance backlog stagnation
Principles
- Decisions must be persisted and authoritative before downstream progression
- System proposes, architect decides: automation assists but human governance remains authoritative
- Extend rather than rewrite: anchor capabilities on existing primitives (ADR, AEM, AID)
- Prefer verified traceability and evidence isolation over speculative abstraction
- Maintain strict separation between orchestration execution and prompt reasoning logic
Emergent Heuristics
promotion_gate: No evolution item may enter stage NEXT without an accepted ADR in forum status. intake_hygiene: Reject any architecture work submission containing unvalidated or placeholder symbols. alignment_frequency: Continuous alignment evaluation must run upon every structural PR or decision state change.